2010 Craftsmanship Awards Winners


A next to the project name indicates that the project was nominated for the special Star Award

Concrete

Cast-in-Place Concrete

(including formwork & reinforcement)

Alex Bernal, Andres Berrios, Enrique Gamboa, Jimmy Jeffries, Juan Ramon Melgares, Curtis Thurston - Clark Concrete Contractors, LLC

Project Name: Arena Stage at the Mead Center for American Theater, Washington, DC
Architect: Bing Thom Architects
Engineer: Fast + Epp
General Contractor: Clark Construction Group, LLC

Carlos Hernandez, Jose Rivera, Ron Turley, Wilfredo Urquilla, Juan Valladares, Daniel Wolf - Clark Concrete Contractors, LLC

Project Name: U.S. Institute of Peace Headquarters, Washington, DC
Architect: Moshe Safdie and Associates, Inc.
Engineer: Buro Happold Consulting Engineers, PC
General Contractor: Clark Construction Group, LLC

Doors and Windows

Curtain Walls

Justin Cockman, Bob Youngs, Corey Youngs - Zimmcor

Project Name: 1801 K Street, NW, Washington, DC
Architect: Skidmore, Owings & Merrill
Engineer: Girard Engineering, PC
Structural Engineer: Robert Silman Associates
General Contractor: Jones Lang LaSalle Construction

Shawn Currie, Todd Deater, Orlando Orosco, Roman Orosco, Khamsay Thongthip, Kevin VanZimmcor - Zimmcor

Project Name: Constitution Center, Washington, DC
Architect: SmithGroup
Engineer: SK&A Structural Engineers, PLLC
General Contractor: James G. Davis Construction Corporation

Alex Chelekhov, Eduardo Mariscal, Juan Mariscal - GPR, Inc.

Project Name: Bicycle Transit Center at Union Station, Washington, DC
Architect: KGP Design Studios
General Contractor: Grunley-Walsh

Tony Campanella, Tim Crouch, Michael Hart, Mike Lekanka, Carlos Serrano, Derrick Wolf - CBO Glass

Project Name: 700 Sixth Street, Washington, DC
Architect: Hellmuth, Obata + Kassabaum, PC
Structural Engineer: Cagley & Associates, Inc.
General Contractor: Balfour Beatty Construction

David Falk, Scott Froebel, Joe Garvin, Scott Johannes, Steve Vanaskie, Dan Wilkesmore - CBO Glass

Project Name: Crystal Plaza II, Arlington, VA
Architect: Dorsky Hodgson Parrish Yue Architects
Structural Engineer: Tadjer Cohen Edelson Associates, Inc.
MEP Engineer: GHT Limited
General Contractor: Balfour Beatty Construction

John Butler, Doug DeGraw, Ric RobertsIcon EBS and Dean Beane, Nathan Bergen, Michael Marshall - Structurecraft Builders


Project Name: Arena Stage at the Mead Center for American Theater, Washington, DC
Architect: Bing Thom Architects
Engineer: Fast + Epp
General Contractor: Clark Construction Group, LLC
The renovation and expansion of the Arena Stages performing arts campus in Southwest D.C. covered 200,000 square feet and took 29 months. It included the creation of a new performance arts space, the Cradle Theater, and extensive improvements to the existing buildings. The glass curtain wall allows a transparency from the exterior and interior spaces. The timber-column-backed curtain wall is a joint design-build effort between Structurecraft Builders and Icon Exterior Building Solutions. Structurecraft designed and fabricated the parallel strand lumber columns and muntin arms in its Vancouver facility. Icon designed and fabricated the structurally-glazed curtain wall units. Each unit is roughly six feet by 12 feet and weighs over 600 pounds. Due to the geometry of the wall, most units were custom made for each location in the wall.
Star Award Winner for Technical Excellence

Aaron Bast, Roy Bolling, Robert Dudley, Klint Jackson, Mike Pray, Tyrone Thomas - Harmon, Inc.

Project Name: Constitution Square OB-2, Washington, DC
Architect: Hellmuth, Obata + Kassabaum, PC
Engineer: Tadjer Cohen Edelson Associates, Inc.
General Contractor: Clark Construction Group, LLC

Windows and Storefronts

(including glass, glazing & skylights)

Jonathan Gutaerraz, Edgar Martinez, Nestar Martinez, Daniel Misscoco, Jose Orellana, Luis Padilla - EDCO Glass Systems

Project Name: Savoy Elementary School, Washington, DC
Architect: Bowie Gridley Architects
General Contractor: SIGAL Construction Corporation

Maricio Aparico, Enrique Cortez, Mario Cruz, Jeff King, Tim Ramberg, Luis Salgado - Custom Walls and Windows, Inc.

Project Name: Ward 3 Aquatic Center (Wilson Pool), Washington, DC
Architect: Hughes Group Architects
General Contractor: SIGAL Construction Corporation

Electrical

Lighting Systems

Daniel Y. Bedard, Patrick V. Latham, III, Andrew Paul Malizio, William R. Nelson - Mona Electric Group, Inc.

Project Name: 51 Louisiana Avenue, Washington, DC
Architect: HKS, Inc.
Engineer: TOLK, Inc.
General Contractor: Clark Construction Group, LLC

Danny Groht, Gary Lee, Gene Mills, Jacob Manoogian, Brooks McClain, Janie Oliver - J.E. Richards, Inc.

Project Name: W Hotel (Formerly Hotel Washington), Washington, DC
Architect: BBG-BBGM
Engineer: Joseph R. Loring & Associates, Inc.
General Contractor: HITT Contracting Inc.

Chris Cady, Mark Carter, Greg Cobaugh, Erin Hickman, Senesha Matokovich, Tom Shannon - Singleton Electric Company, Inc.

Project Name: DC Court of Appeals, Washington, DC
Architect/Engineer: Beyer Blinder Belle
Engineer: Joseph R. Loring & Associates, Inc.
General Contractor: Hensel Phelps Construction Company

Jon Bayeaux, Danny Lambert, Greg Miller, Steve Slagle - T.A. Beach Corp.

Project Name: Montgomery College Cultural Arts Center, Silver Spring, MD
Architect/Engineer: SmithGroup JJR
General Contractor: Bovis Lend Lease

Brad Behm, Dave Pierce, Todd Ransom, Bill Rhodes, Ed Rhodes, Mike Spear - Power Solutions, LLC

Project Name: Children’s National Medical Center Inpatient Tower Fit Out, Washington, DC
Architect/Engineer: HDR One Company
General Contractor: HITT Contracting Inc.

James Carson, Jeff Cowan, Demal Dzelalic, Shawn Mooney, Jeremy Nelson, Jay Potts - J.E. Richards, Inc.

Project Name: Eisenhower Theatre, Washington, DC
Architect: Quinn Evans Architects
Engineer: Mueller Associates, Inc.
General Contractor: The Whiting-Turner Contracting Company

Russell Bloss, John Bozzel, John Jenkins, III, John Jenkins, Jr., Marty Reedy, John Richards - J.E. Richards, Inc.

Project Name: 1801 K Street, NW, Washington, DC
Architect: Skidmore, Owings & Merrill
Engineer: Girard Engineering, PC
General Contractor: Jones Lang LaSalle Construction

Power Generation, Distribution and Switchgear

Donnie Beach, Eddie Bihlear, Devon Gaylor, Rich Ladow, Kenny Muschette, Ransford Robinson - Truland Systems Corporation

Project Name: New Campus EastCentral Utility Plant, Springfield, VA
Architect/Engineer: RTKL/KlingStubbins
General Contractor: Clark/Balfour Beatty NGA, A Joint Venture

Bill Figgers, Joe Fuentes, Doug Leggat, Roy Meyer, Andrew Talcott, Walter Williams - Dynalectric Company

Project Name: New Campus EastTechnology Center, Springfield, VA
Architect/Engineer: RTKL/KlingStubbins
General Contractor: Clark/Balfour Beatty NGA, A Joint Venture

Chet Gagnon, Andy Hartnett, Ignacio Luna, Doug Thomas, George Wicks, Nick Young - Young Electrical Contractors, Inc.

Project Name: POD-3 Renovation, Suitland, MD
Architect/Engineer: EwingCole
General Contractor: Clark Construction Group, LLC

Philip Boyd, Sam Brogan, Mark Eriksson, Kevin Patterson, Shane Sparks, Ben Staniewicz - Truland Walker Seal JV

Project Name: Washington Metropolitan Area Transit Authority Traction Power Upgrade Program, Washington, DC
Engineer: Parsons Transportation Group (P2D)
General Contractor: Truland Walker Seal JV

Joe Dugan, Joseph Lajoie, Eric Neville, Nick Noonan, Russel Way - Freestate Electrical Construction Company

Project Name: National Institutes of Health: CIT Building No. 12, Infrastructure UpgradePhase 1, Bethesda, MD
Architect: Ann Myers Architecture
Engineer: WFT Engineering, Inc.
General Contractor: Tishman Construction Corporation
The key to the project was to determine how to install 9,6000 feet of feeder conduit, 300 feet of 2500-Amp copper busway and 200 feet of 5000-Amp copper buss way, HVAC ductwork, pre-action fire suppression system and a fire detection systems in a ceiling space of three and half feet. Freestate Electrical installed the electrical design for the new UPS which consists of three incoming 15 KVA services to a main distribution switchgear. The switchgear consists of an A side main and B side main. The center main is connected via tie breakers to the A and B side of the gear achieving one common bus. There are two generator paralleling gears, PSG-A and PSG-B. Each gear consists of three sets of electrical bus—a No-Break bus, a Short-Break bus and a Common bus connecting the two choke reactors at either end of the PSG boards. Both PSG boards are connected via a 5,000 Amp cross link bus way. The four choke reactors are fed from the utility MDS gear via a 2,500 Amp bus way and from two Continuous Power System (CPS). The CPS units are synchronous condenser/ ac-motor unit which supply a leading power factor to compensate for the potential lagging power factor on the utility. There are four 3-source Digital Static Transfer Switches. Two sources are from the PSG-A, B boards and the third is from the utility board. The load side feeds distribution boards T1-T4.
Star Award Winner for Excellence in the Face of Adversity

David August, Robert Daigle, Chuck Knaack, Glenn Laser, John M. Thir, Jr., Markco Yates - Natelco Corporation

Project Name: Silver Spring Data Center UPS Replacement, Silver Spring, MD
Architect: Arium AE
Engineer: CCG Facilities Integration, Inc.
General Contractor: Holder Construction Company

Mike Caffrey, Dwight Daniels, II, Mike Johnson, Garth Kelly, Ha Le, Robert Stephens - Singleton Electric Company, Inc.

Project Name: Arlington County Water Pollution Control Panel, Arlington, VA
Architect/Engineer: Malcom Pirnie
General Contractor: Fru-Con Construction Corporation

Jeff Hicks, Randy Higgs, Eric Johnston, Buddy McDowell, Cordelia McKoy, Richie Roberts - Power Solutions, LLC

Project Name: Amazon.com IAD6 Pod7, Ashburn, VA
Engineer: EYP
Star Award Nominee

Eric Figueroa, Thomas Gregory, Kyle Murphy, Elwood Ness, Steve Rivera, Dwight Williams - J.E. Richards, Inc.

Project Name: IBM-NCEP Phase 4, Gaithersburg, MD
Architect/Engineer: McKinney & Company
General Contractor: Skanska USA Building

Special Systems

(including security, control & instrumentation)

Mike Buser, Kevin Cole, Kyle Priddy, John Zanelotti - Ennis Electric Co., Inc.

Project Name: New Campus EastTechnology Center, Springfield, VA
Architect/Engineer: RTKL/KlingStubbins
General Contractor: Clark/Balfour Beatty NGA, A Joint Venture

Brian Cramutola, Kathy Freeland, John Kassmer, Jeff Marshall, Shawn Samii, Ray Scheuring - Diversified Systems

Project Name: Teleproductions International, Chantilly, VA
Architect: Gileau-Poulton Architects and Associates, PC
Engineer: Diversified Systems
General Contractor: Forrester Construction Company

Brian Baniszewski, Mike Brawner, Edwin Lugan, Scott Ponton, Dave Thorne, Bob Wood - Freestate Electrical Construction Company

Project Name: Goodwin House Bailey's Crossroads, Falls Church, VA
Architect: Dorsky Hodgson Parrish Yue Architects
Engineer: KTA Group, Inc.
General Contractor: The Whiting-Turner Contracting Company

Kenneth P. Bremerman, Donte M. Jackson, Thomas Jason Kite, Charles R. Martin, Jr., David W. Moore - Mona Electric Group, Inc.

Project Name: Columbia Square, Washington, DC
Engineer: WCIS Consulting, LLC
General Contractor: K3 Construction Group

Aaron A. Day, Bernard A. Johnson - Mona Electric Group, Inc.

Project Name: Willard Intercontinental, Washington, DC

Robert Drescher, Tanya Filkins, Chris Harper, Richard Mercer, Gregory Ward, Jon Whiston - Dynalectric Company

Project Name: Alexandria Powerhouse Recovery Project, Alexandria, VA
Architect/Engineer/General Contractor: Mirant

Finishes

Ceramic Tile and Terrazzo

Lakesha Coates, Telly Koutris, Vince McCoy, Victor Rodriguez - David Allen Company

Project Name: Constitution Center, Washington, DC
Architect: SmithGroup
General Contractor: James G. Davis Construction Corporation

Keith Oliver - David Allen Company

Project Name: Georgetown University McDonough School of Business, Washington, DC
Architect: Goody Clancy Associates
General Contractor: The Whiting-Turner Contracting Company

Carlos Cumes, William Gray, Phillip Jones, Limbert Perez, Sang Yun, Ung Yun - Ward Ceramic Tile & Stone, Inc.

Project Name: Potenza Trattoria Bakery & Wine, Washington, DC
Architect: CORE
General Contractor: Forrester Construction Company

Lakesha Coates, Vince McCoy, Telly Koutris, Victor Rodriguez - David Allen Company

Project Name: Tyser Tower Renovation and Expansion, College Park, MD
Architect: Heery International, Inc.
General Contractor: Clark Construction Group, LLC

Carlos Amaya, Miguel Flores, Lisandro Guevara, Tom Hess, Jose Rivas, Mike Trevisan - Roman Mosaic and Tile Company

Project Name: Crystal Plaza II, Arlington, VA
Architect: Dorsky Hodgson Parrish Yue Architects
Structural Engineer: Tadjer Cohen Edelson Associates, Inc.
MEP Engineer: GHT Limited
General Contractor: Balfour Beatty Construction

Drywall

(including framing & finishing)

Jose Alba, Tony Cassette, Tommy Hurlock, Fred Jackson, Roger Marsden, Jose Perez - C. J. Coakley Co., Inc.

Project Name: Constitution Center, Washington, DC
Architect: SmithGroup
General Contractor: James G. Davis Construction Corporation

Steve Biniek, Luis Ramirez Guzman, Oscar Guzman, Abel Romo, Everado Romo, Leopoldo Romo - Capitol Drywall, Inc.

Project Name: The Georgetown Preparatory School New Learning Center, North Bethesda, MD
Architect: Cox Graae + Spack Architects
General Contractor: The Whiting-Turner Contracting Company

Earl Ferguson, Sean Rigsby, Tim Rigsby - Cleveland Construction

Project Name: Arena Stage at the Mead Center for American Theater, Washington, DC
Architect: Bing Thom Architects
Engineer: Fast + Epp
General Contractor: Clark Construction Group, LLC

Fernando Alvarado, Desi Crooks, Roberto Diaz, Carl Hoffner, Jorge Portillo, Dennis Urias - S. Di Gregorio & Son, Inc.

Project Name: Wyndham at National Harbor, Oxon Hill, MD
Architect: WDG Architecture, PLLC
Engineer: GHT Limited
General Contractor: Balfour Beatty Construction

Painting & Wallcovering

Danielle DeFrancisco, Joe Hartlove, Sebastian Montano, Juan Morales, Selvin Morales, Magarito Vargas - NLP Enterprises, Inc.

Project Name: The Jefferson Hotel Renovation & Revitalization, Washington, DC
Architect: ForrestPerkins
General Contractor: SIGAL Construction Corporation

Arturo Beltran, Cesar Echevarria, Jonathan Echevarria, Roberto Echevarria, Ivan Fitz, Nelson Martinez - Precision Wall Tech, Inc.

Project Name: Georgetown University McDonough School of Business, Washington, DC
Architect: Goody Clancy Associates
General Contractor: The Whiting-Turner Contracting Company

Plaster

(including Stucco and Dryvitt)

Raymond Andrews, Nathan Bell, Jimmy Pryor, Mike Robb, Billy Underwood, Jeff Zeman - John H. Hampshire, Inc.

Project Name: Alice Deal Middle School, Washington, DC
Architect: Quinn Evans Architects
General Contractor: Prince / Schlosser Joint Venture

Shirlon Elvis Maynard, Daniel McLean, Ceasar Philpot, Bruce Tomaselli - Office of the Architect of the Capitol

Project Name: House Office Buildings Sprinkler Installation, Washington, DC

Edwin Castellon, Henry Castellon, Serge Vadenoff - Senza Finé

Project Name: Teleproductions International, Chantilly, VA
Architect: Gileau-Poulton Architects and Associates, PC
General Contractor: Forrester Construction Company
Star Award Nominee

Specialty Painting

Eddy Bustos, Walter Chavez, Marvin Hurtado, Josias Sanchez, Jeff Storm - Brien A. Miller Painting Co., Inc.

Project Name: Headquarters of the American Pharmacists Association (APhA), Washington, DC
Architect: Hartman-Cox Architects
General Contractor: Tishman Construction Corporation of DC

Masonry

Exterior Stone

(including marble, granite & exterior pavers)

Eric Holloway, Francisco (Paco) Lorenzo, Jose Lopez, Jose A. Marquez, Jhony A. Reyes, Cipriano Vidal - Lorton Stone, LLC

Project Name: Howard Hughes Medical Institute Headquarters ExpansionPhase II, Chevy Chase, MD
Architect: Bowie Gridley Architects
General Contractor: Clark Construction Group, LLC

Vital Cardoso, Manuel Dobarco, Mario Guzman, Martin Lucio, Jose Neves, Mark Sanders - Lorton Stone, LLC

Project Name: Semper Fidelis Memorial Park Chapel, Triangle, VA
Architect: Fentress Architects
Engineer: Ammann & Whitney
General Contractor: Forrester Construction Company

Interior Stone & Marble

Michael R. Patterson, Juan J. Rodriguez, Ronald S. Wondoloski - Boatman and Magnani, Inc.

Project Name: The Jefferson Hotel Renovation & Revitalization, Washington, DC
Architect: ForrestPerkins
General Contractor: SIGAL Construction Corporation

Unit Masonry

Terry Bricker, Nathan Delabar, Westley Douglas, Fernando Torres, Rudy Torres - Manganaro Midatlantic, LLC

Project Name: Howard Hughes Medical Institute Headquarters ExpansionPhase II, Chevy Chase, MD
Architect: Bowie Gridley Architects
General Contractor: Clark Construction Group, LLC

Scott Bryan, Jose Cruz, Greg Dodson - Karon Masonry of Maryland

Project Name: St. Elizabeths New Hospital, Washington, DC
Architect: EYP
General Contractor: Tompkins Builders, Inc.

Mechanical

HVAC-Piping

Harold Flowers, George Giddings, Don Mullens, Steve Owens, Tommy Tanner - John J. Kirlin, LLC

Project Name: Hilton Washington Guest Room Renovation, Washington, DC
Architect: OPX
Engineer: Leach Wallace Associates
General Contractor: The Whiting-Turner Contracting Company

Scott Coble, Frank Davis, Brian Goodrich, Jack Leverstein, Kenneth Perigo, Carl Proctor - JCM Associates, Inc.

Project Name: Howard Hughes Medical Institute Headquarters ExpansionPhase II, Chevy Chase, MD
Architect: Bowie Gridley Architects
Engineer: Syska Hennessy Group
General Contractor: Clark Construction Group, LLC

Dave Bauer, Yunmy Carrol, Keith Fletcher, Brian Houser, Trent Jackson, Ricky Stevens - W.E. Bowers, Inc.

Project Name: 1999 K Street, Washington, DC
Architect: WDG Architecture, PLLC
Engineer: GHT Limited
General Contractor: James G. Davis Construction Corporation

Thomas Athanason, Richard Cherba, Anthony Davis, Matthew Hill, Michael Spears, John Tatro - Pierce Associates, Inc.

Project Name: Constitution Center, Washington, DC
Architect/Engineer: SmithGroup
General Contractor: James G. Davis Construction Corporation
Star Award Nominee

HVAC-Sheet Metal

William Flaherty, Juan Luyo, David Nickless, Josh Nida, David Peak, Jr., Gary Rawlings - Stromberg Metal Works, Inc.

Project Name: University Biomedical Research Laboratory, Manassas, VA
Architect: RMJM
Engineer: Bard, Rao + Athanas Consulting Engineers, LLC
General Contractor: The Whiting-Turner Contracting Company

Rod Bates, Darius Canty, Robert Peliculinas, Marcus Tongue, Dale Werner, Tony Wheeler - Southland Industries

Project Name: Walter Reed National Military Medical Center (at National Naval Medical Center), Bethesda, MD
Architect: HKS, Inc.
Engineer: Southland Industries
General Contractor: Clark Balfour Beatty JV

Tim Barnes, Ted Cumberland, Christopher Fitzpatrick, Al Mathias, Joe Pope, Mike Sellers - Pierce Associates, Inc.

Project Name: Constitution Center, Washington, DC
Architect/Engineer: SmithGroup
General Contractor: James G. Davis Construction Corporation
Star Award Nominee

Plumbing

John Burroughs, Charles Gran, David Holmes, Charles Hotchkiss, John Yeatts - Office of the Architect of the Capitol

Project Name: House Office Buildings Sprinkler Installation, Washington, DC
Star Award Nominee

David Coté, Dean Feldman, Kenneth Hollingshead, Jeffery Horsmon, Gene Sappington, Scott Styles - Pierce Associates, Inc.

Project Name: Constitution Center, Washington, DC
Architect/Engineer: SmithGroup
General Contractor: James G. Davis Construction Corporation

Metals

Miscellaneous Metal Fabrication

Ruben Cano, Francisco C. Cuevas, III, Melchor Martinez, Alexander Mendoza, Baltazar Perdomo, Raul Salmeron - Big D Metalworks

Project Name: International Professional Services Firm, Washington, DC
Architect: Fox Architects / McMurray Architectural Interiors
Engineer: Thornton Tomasetti
General Contractor: HITT Contracting Inc.

Ornamental Metal

Steve Ash, Joseph Perry - American Iron Works

Project Name: 1801 K Street, NW, Washington, DC
Architect: Skidmore, Owings & Merrill
Engineer: Girard Engineering, PC
Structural Engineer: Robert Silman Associates
General Contractor: Jones Lang LaSalle Construction

Zdzislaw Kiszczak, Bogdan Krenca, Waldemar Lezczynski, Xuong Hien Luc, Janusz Mlynarczyk, Peter Perry - Soheil Mosun Limited

Project Name:700 Sixth Street, Washington, DC
Architect: Hellmuth, Obata + Kassabaum, PC
Structural Engineer: Cagley & Associates, Inc.
General Contractor: Balfour Beatty Construction

Beltran Beita, Steve Cavanah, Ricky Gregory, Ron Jones, Darrell Keen, Ted Thoms - Tate Ornamental, Inc.

Project Name: Georgetown University McDonough School of Business, Washington, DC
Architect: Goody Clancy Associates
General Contractor: The Whiting-Turner Contracting Company

Structural Steel Framing

Robert Bading, Chet McPhatter, Jimmie Wilson - Banker Steel Company

Project Name: Arena Stage at the Mead Center for American Theater, Washington, DC
Architect: Bing Thom Architects
Engineer: Fast + Epp
General Contractor: Clark Construction Group, LLC

Ruben Herrera, Richard Johnson, Will Romero - Superior Iron Works, Inc.

Project Name: 1999 K Street, Washington, DC
Architect: Murphy/Jahn Architects
Engineer: Werner Sobek Ingenieure International
General Contractor: James G. Davis Construction Corporation

Sitework

Underpinning, Foundations and Excavations

Gene Craig, Fabian Lehmann, Herman Ward, Tom Ward - Schnabel Foundation Company

Project Name: The American Trucking AssociationsCapitol Hill Legislative Offices, Washington, DC
Architect: RTKL Associates Inc.
Engineer: Tadjer Cohen Edelson Associates, Inc.
General Contractor: Forrester Construction Company

Special Construction

Historic Preservation

Sefik Civic, Wilfredo Fuentes, Naser Hasadzinovic, John Minihane, Timothy Schwind, Jr., Timothy Schwind Sr. - Worcester Eisenbrandt, Inc.

Project Name: Chinese Community Church Tower and Restoration, Washington, DC
Architect: Rippeteau Architects, PC
Engineer: Robert Silman Associates
General Contractor: Worcester Eisenbrandt, Inc.

Infrastructure: Utility & Roadway

John Addison, Mike Collins, Hank Miller, Bill Schuster, Donnie Smith, Mark Valentine - Flippo Construction Company, Inc.

Project Name: The Yards at Southeast Federal Center Infrastructure, Washington, DC
Architect: Shalom Baranes Associates
Engineer: VIKA, Inc.
General Contractor: Flippo Construction Company, Inc.

Sewer Relining

Dan Cassel, Jason McAnally, Salvatore Parades, Datta Shirodkar - Boyer, Inc.

Project Name: 401 M Street, SW / Waterfront, Washington, DC
Architect: Shalom Baranes Associates
Engineer: Tadjer Cohen Edelson Associates, Inc.
General Contractor: Clark Construction Group, LLC

Thermal and Moisture Protection

Dave Baker, Jose Gonzalez, Carlos Moreno, Dave Morgan, Elias Pineda - Calvert Masonry, Inc.

Project Name: 401 M Street, SW / Waterfront, Washington, DC
Architect: Shalom Baranes Associates
Engineer: Tadjer Cohen Edelson Associates, Inc.
General Contractor: Clark Construction Group, LLC

Woods & Plastics

Architectural Millwork

Adam Erdley, Joe Fleck, Jason Hunter, David Lee, Jim McAllister, Matt Moore - ISEC, Inc.

Project Name: Howard Hughes Medical Institute Headquarters ExpansionPhase II, Chevy Chase, MD
Architect: Bowie Gridley Architects
General Contractor: Clark Construction Group, LLC

Tony Barbery, Joel Cabanban, Wayne Libby, Roger Parker, Mike Pullen, Wade Sampsell - Gaithersburg Cabinetry and Millwork


Project Name: The Jefferson Hotel Renovation & Revitalization, Washington, DC
Architect: ForrestPerkins
General Contractor: SIGAL Construction Corporation
Gaithersburg Cabinetry and Millwork installed a variety of paint and stain grade millwork throughout the basement and first floor of the hotel. Their work included paint grade wall panels with silk inset panels and hidden doors at the meeting rooms, mahogany casework, wall panels, shelving and concealed shutters in the library; and historic heart pine wall panels and casework in the Private Dining Room. Due to elaborate detail, the work required extensive coordination with the other trades. Renovation of structure with existing walls and slabs that were out of square and level, along with numerous ceiling conflicts and obstructions, created challenges that required rework of the millwork details to create a cohesive structure.
Star Award Winner for Visual Excellence

Dominic Giovinazzo, Jose Murillo, Hanh Nguyen, Kenneth Ramey, Jim Short, Bert Ward - Jefferson Millwork & Design, Inc.

Project Name: College Board, Reston, VA
Architect: A2 Design, Inc.
General Contractor: HITT Contracting Inc.


Pat Kelly, James Maldenaldo, Tony Maldenado - The Washington Woodworking Company

Project Name: Jones Day, Washington, DC
Architect: Lehman Smith McLeish
Engineer: TOLK, Inc.
General Contractor: HITT Contracting Inc.

Gary Connor, Grant Ferrin, Kim Sharp, Randy Smith, John Soderquist, Tyler Talbot - Fetzer Architectural Woodwork

Project Name: Georgetown University McDonough School of Business, Washington, DC
Architect: Goody Clancy Associates
General Contractor: The Whiting-Turner Contracting Company